top of page

Static Equipment Cleaning & Maintenace 

Client

Снимок экрана 2025-04-11 152641.png

Dragon Oil Turkmenistan Limited (DOTL)

Locations

images.png

Central Processing Facility

(CPF)

Timeline

2024 - Present

Description

The project involves the Turnaround and Inspection (T&I) services for Dragon Oil’s onshore and offshore facilities in the Cheleken Contract Area, Turkmenistan. The objective is to execute a comprehensive turnaround, cleaning, inspection, maintenance, and repair campaign for static equipment—including pressure vessels, columns, heat exchangers, tanks, and other related assets—to ensure safe, reliable, and efficient operations. The project scope covers preparatory activities, site execution, and post-turnaround close-out, focusing on both brownfield and greenfield units across multiple locations including the Lam and Zhdanov offshore platforms and onshore Central Processing Facility (CPF).

Activities

  • Planning, coordination, and execution of Turnaround and Inspection (T&I) activities

  • Cleaning (mechanical and chemical) and maintenance of static equipment such as pressure vessels, columns, and tanks

  • Internal and external inspection of equipment using qualified NDT methods

  • Blinding/deblinding, isolation, and hydrocarbon gas-freeing of systems

  • Mechanical repair, replacement, and reassembly of components

  • Support for lifting, rigging, scaffolding, and confined space entry operations

  • Compliance with HSE, QA/QC standards, and project documentation protocols

  • Demobilization, site reinstatement, and final reporting

© 2025 by ESDA. All rights reserved.

  • Linkedin
bottom of page